Location:

I-15 between 0.75 mile S of Boulder River Road-Exit 151 and 0.75 mile N of Basin-Exit 156

Construction:

The following construction project is in effect: bridge work between 2 miles south and 0.75 mile north of Basin-Exit 156 including reduced speed (travelers can expect single lane traffic).

Restrictions:

The following restriction is in effect: width restriction limited to 12 feet between 2 miles south and 0.75 mile north of Basin-Exit 156.