Location:

I-15 between 2 miles S of Basin-Exit 156 and 1.25 miles S of Junction Montana 61-Boulder-Exit 164

Construction:

The following construction project is in effect: paving including reduced speed.

Restrictions:

The following restriction is in effect: width restriction limited to 12 feet.