Location:

I-15 between 1 mile N of Collins Road-Exit 321 and Junction Montana Secondary 365-Brady-Exit 328

Construction:

The following construction project is in effect: chip sealing including reduced speed limited to 35 MPH (travelers can expect single lane closures, loose gravel, and rough road surface). Motorcycles should consider alternate route.

Restrictions:

The following restriction is in effect: width restriction limited to 16 feet.