Location:

I-90 between 0.25 mile E of Junction King Avenue-Billings-Exit 446 and 0.25 mile W of Junction Interstate 94-Exit 456

Construction:

The following construction project is in effect: paving including delays up to 15 minutes, flaggers present, and reduced speed limited to 35 MPH (travelers can expect loose gravel, rough road surface, grooved road surface, single lane traffic, fresh oil, single lane closures, and traffic controlled by signal lights).