Location:

I-90 between 2.25 miles E of Junction Montana Secondary 507-Lothrop-Exit 77 and 0.25 mile W of Phosphate-Exit 170

Construction:

The following construction projects are in effect: bridge work including flaggers present and reduced speed limited to 35 MPH (travelers can expect single lane closures and traffic controlled by signal lights), median work between 1.25 miles west of Huson-Exit 85 and 2 miles west of Junction US 93 North and Montana 200 North-Exit 96 including reduced speed limited to 55 MPH (travelers can expect single lane closures), reconstruction at 0.25 mile east of Orange Street-Missoula-Exit 104 including flaggers present (travelers can expect single lane closures), bridge work between Junction Montana 200-Bonner and Milltown-Exit 109 and 0.50 mile east of Junction Montana 200-Bonner and Milltown-Exit 109 including reduced speed limited to 45 MPH (travelers can expect single lane traffic), milling between 3.25 miles west of Bearmouth-Exit 138 and 3.25 miles west of Junction Montana 1-Drummond-Exit 153, and sign installation between 2.75 miles east and 3 miles east of Bearmouth-Exit 138 including flaggers present and reduced speed (travelers can expect single lane closures and single lane traffic).

Restrictions:

The following restriction is in effect: width restriction limited to 16 feet.