Location:

US-87 between Junction US 89 South and 3.25 miles N of Junction Montana Secondary 427 South

Construction:

The following construction projects are in effect: guardrail work at 3.25 miles north of Junction Montana Secondary 427 South including delays up to 15 minutes, flaggers present, and reduced speed limited to 35 MPH (travelers can expect single lane closures, traffic controlled by signal lights, and a pilot car in use) and shoulder work between 3.75 miles south and 1.50 miles south of Junction US 89 South including delays up to 15 minutes, flaggers present, and reduced speed limited to 35 MPH (travelers can expect traffic controlled by signal lights).