Location:

US-2 between 3.75 miles W and 4.50 miles E of Junction Montana Secondary 343-Galata

Construction:

The following construction project is in effect: reconstruction including delays up to 15 minutes and reduced speed (travelers can expect gravel surface, loose gravel, traffic controlled by signal lights, a pilot car in use, and single lane traffic). Motorcycles should consider alternate route.