Location:

US-2 between 0 mile W and 1.75 miles E of Poplar

Construction:

The following construction project is in effect: pulverizing including intersection work, a detour, flaggers present, and reduced speed limited to 35 MPH (travelers can expect loose gravel, rough road surface, and single lane traffic).

Restrictions:

The following restriction is in effect: width restriction limited to 12 feet.