Location:

I-15 between Dillon-Exit 63 and Butte-Exit 129

Road Conditions:

Road conditions as of 1:45 AM MDT on Saturday, May 27 are as follows: dry. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction project is in effect: crack sealing between 0.50 mile north of Melrose-Exit 93 and 0.25 mile north of Junction Montana 43-Exit 102 including reduced speed (travelers can expect single lane traffic).

Facilities:

Rest areas along this highway segment are: open northbound at 2.75 miles south of Feely-Exit 111 (services available include handicapped accessible) and open southbound at 2.75 miles south of Feely-Exit 111 (services available include truck parking and handicapped accessible).

Weather:

The forecast until 8:00 AM MDT on Saturday, May 27: Skies will be partly clear becoming mostly clear. Visibility will be five miles in haze changing to ten miles. Widely scattered very light rain will be ending. Winds will be calm changing to 5 mph from the west. Temperatures will range from 36 to 44 F changing to 34 to 40 F.