Location:

I-15 between Dillon-Exit 63 and Butte-Exit 129

Road Conditions:

Road conditions as of 7:00 AM MDT on Thursday, June 20 are as follows: dry. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction projects are in effect: bridge work between 0.50 mile south of Junction Montana Secondary 276-Nissler-Exit 122 and 0.25 mile north of Montana Street-Butte-Exit 126 including reduced speed (travelers can expect single lane traffic) and reconstruction between 0.25 mile south and 0.25 mile north of Junction Montana Secondary 276-Nissler-Exit 122 including reduced speed (travelers can expect single lane traffic).

Restrictions:

The following restriction is in effect: width restriction limited to 18 feet between 0.50 mile south of Junction Montana Secondary 276-Nissler-Exit 122 and 0.25 mile north of Montana Street-Butte-Exit 126.

Facilities:

Rest areas along this highway segment are: open northbound at 2.75 miles south of Feely-Exit 111 (services available include truck parking and handicapped accessible) and open southbound at 2.75 miles south of Feely-Exit 111 (services available include truck parking and handicapped accessible).

Weather:

The forecast until 1:00 PM MDT on Thursday, June 20: Skies will be partly cloudy becoming mostly cloudy. Visibility will be ten miles. There will be occasional very light rain changing to continuous thunderstorms. Winds will be 4 mph from the west-southwest changing to 8 mph gusting to 16 mph from the northwest. Temperatures will range from 28 to 40 F changing to 38 to 52 F.