Location:

I-15 between Dillon-Exit 63 and Butte-Exit 129

Road Conditions:

Road conditions as of 8:45 AM MDT on Friday, May 6 are as follows: dry with the following exception - possible fallen rocks between 0.25 mile south of Rock Creek-Exit 85 and 2.75 miles south of Feely-Exit 111. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction projects are in effect: miscellaneous maintenance between 2.50 miles south and 2.25 miles south of Feely-Exit 111 and miscellaneous maintenance between 0.50 mile south of Junction Interstate 90 West-Exit 121 and Junction Interstate 90 West-Exit 121.

Facilities:

Rest areas along this highway segment are: open northbound at 2.75 miles south of Feely-Exit 111 (services available include handicapped accessible) and open southbound at 2.75 miles south of Feely-Exit 111 (services available include truck parking and handicapped accessible).

Weather:

The forecast until 3:00 PM MDT on Friday, May 6: Skies will be overcast becoming mostly cloudy. Visibility will be ten miles. There will be occasional very light rain changing to scattered very light rain. Winds will be 8 mph gusting to 24 mph from the north-northeast changing to 18 mph gusting to 27 mph from the northeast. Temperatures will range from 41 to 55 F changing to 45 to 63 F.