Location:

I-15 between Great Falls-Exit 280 and Conrad-Exit 339

Road Conditions:

Road conditions as of 4:00 PM MDT on Sunday, June 17 are as follows: dry. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction project is in effect: bridge work between 4 miles south of Junction Montana Secondary 221 and 379-Dutton-Exit 313 and 1.50 miles north of Collins Road-Exit 321 including delays up to 10 minutes and reduced speed (travelers can expect single lane closures).

Facilities:

Rest areas along this highway segment are: open northbound at 2.25 miles south of Collins Road-Exit 321 (services available include handicapped accessible), open southbound at 2.25 miles south of Collins Road-Exit 321 (services available include handicapped accessible), and open northbound at Junction Interstate 15 Business Route-Conrad-Exit 339 (services available include truck parking and handicapped accessible).

Weather:

The forecast until 10:00 PM MDT on Sunday, June 17: Skies will be overcast becoming mostly cloudy. Visibility will be ten miles. Widely scattered very light rain will be ending. Winds will be 10 mph gusting to 19 mph from the east-southeast changing to 11 mph gusting to 19 mph from the east-northeast. Temperatures will range from 59 to 63 F changing to 56 to 58 F.