Location:

I-90 between East Missoula-Exit 109 and Drummond-Exit 154

Road Conditions:

Road conditions as of 3:45 PM MDT on Friday, July 10 are as follows: dry. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction projects are in effect: bridge work between Junction Montana 200-Bonner and Milltown-Exit 109 and 0.75 mile east of Junction Montana 200-Bonner and Milltown-Exit 109, milling between 1.75 miles west of Clinton-Exit 120 and 0.25 mile east of Rock Creek-Exit 126 including flaggers present and reduced speed limited to 35 MPH (travelers can expect single lane traffic), and milling between 0.25 mile east of Rock Creek-Exit 126 and 3.25 miles west of Bearmouth-Exit 138 including flaggers present and reduced speed limited to 35 MPH.

Restrictions:

The following restriction is in effect: width restriction limited to 12 feet between Junction Montana 200-Bonner and Milltown-Exit 109 and 0.75 mile east of Junction Montana 200-Bonner and Milltown-Exit 109.

Facilities:

Rest areas along this highway segment are: open westbound at 1 mile east of Rock Creek-Exit 126 (services available include truck parking), open westbound at 4.75 miles east of Bearmouth-Exit 138 (services available include handicapped accessible), and open eastbound at 5 miles east of Bearmouth-Exit 138 (services available include handicapped accessible).

Weather:

The forecast until 10:00 PM MDT on Friday, July 10: Skies will be partly cloudy becoming clear. Visibility will be ten miles. No precipitation is expected. Winds will be 5 mph gusting to 16 mph from the northwest. Temperatures will range from 70 to 78 F changing to 60 to 66 F.