Location:

I-90 between Butte-Exit 227 and Bozeman-Exit 309

Road Conditions:

Road conditions as of 5:00 AM MDT on Monday, September 1 are as follows: dry. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction projects are in effect: bridge work between 0.50 mile east and 2 miles east of Junction Montana 85 and Montana Secondary 291-Belgrade-Exit 298 including a detour, reduced speed, and a road closure (travelers can expect single lane closures, a pilot car in use, and single lane traffic) and bridge work between 1.25 miles west of Junction Montana Secondary 412-Bozeman-Exit 305 and Junction US 191 South-Bozeman-Exit 309 including reduced speed limited to 45 MPH (travelers can expect single lane closures and single lane traffic).

Facilities:

Rest areas along this highway segment are: open westbound at 1.75 miles east of Homestake Pass-Exit 233 (services available include truck parking) and open eastbound at 1.75 miles east of Homestake Pass-Exit 233 (services available include truck parking).

Weather:

The forecast until 11:00 AM MDT on Monday, September 1: Skies will be partly clear becoming partly cloudy. Visibility will be two miles in haze changing to ten miles. Widely scattered very light rain will be ending. Winds will be 9 mph from the west changing to 7 mph from the west-southwest. Temperatures will range from 39 to 49 F changing to 48 to 56 F.