Location:

I-90 between Billings-Exit 452 and Wyoming State Line

Road Conditions:

Road conditions as of 1:30 PM MDT on Sunday, August 25 are as follows: dry. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction projects are in effect: chip sealing between Junction US 87 North-Billings-Exit 452 and 0.25 mile west of Junction Interstate 94-Exit 456, fencing work between Junction US 87 North-Billings-Exit 452 and 0.25 mile east of Junction Interstate 94-Exit 456, and culvert installation between 4.50 miles west and 1.50 miles west of Junction Montana Secondary 463-Lodge Grass-Exit 530 including delays up to 5 minutes and reduced speed limited to 55 MPH (travelers can expect single lane closures and single lane traffic).

Restrictions:

The following restriction is in effect: width restriction limited to 12 feet between 4.50 miles west and 1.50 miles west of Junction Montana Secondary 463-Lodge Grass-Exit 530.

Facilities:

Rest areas along this highway segment are: open eastbound at 2.25 miles west of Fly Creek Road-Exit 478 (services available include handicapped accessible) and open westbound at 2.25 miles west of Fly Creek Road-Exit 478 (services available include handicapped accessible).

Weather:

The forecast until 7:00 PM MDT on Sunday, August 25: Skies will be partly cloudy becoming mostly cloudy. Visibility will be ten miles. There will be widely scattered thunderstorms changing to occasional thunderstorms. Winds will be calm changing to 9 mph gusting to 18 mph from the northwest. Temperatures will range from 72 to 78 F changing to 65 to 73 F.