Location:

I-94 between Billings-Exit 0 and Big Horn-Exit 53

Road Conditions:

Road conditions as of 4:45 AM MDT on Friday, July 28 are as follows: dry. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction project is in effect: bridge work between Junction Interstate 90-Billings-Exit 0 and 0.75 mile east of Junction Montana Secondary 522-Huntley-Exit 6 including a detour and reduced speed limited to 35 MPH (travelers can expect grooved road surface and single lane traffic).

Restrictions:

The following restriction is in effect: width restriction limited to 11 feet between Junction Interstate 90-Billings-Exit 0 and 0.75 mile east of Junction Montana Secondary 522-Huntley-Exit 6.

Facilities:

Rest areas along this highway segment are: open eastbound at 2.25 miles east of Waco-Exit 36 (services available include truck parking and handicapped accessible) and open westbound at 5.25 miles east of Waco-Exit 36 (services available include truck parking and handicapped accessible).

Weather:

The forecast until 11:00 AM MDT on Friday, July 28: Skies will be mostly clear becoming partly cloudy. Visibility will be ten miles changing to five miles in haze. No precipitation is expected. Winds will be 6 mph from the southwest changing to 8 mph from the north. Temperatures will range from 64 to 70 F changing to 78 to 82 F.