Location:

MT-200 between Junction Interstate 90 at Bonner and Lincoln

Road Conditions:

Road conditions as of 1:15 AM MDT on Monday, April 24 are as follows: dry. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction project is in effect: rumble strip maintenance between 4.25 miles west of Junction Montana 141 South-Mineral Hill and Lincoln including delays up to 15 minutes and reduced speed limited to 35 MPH (travelers can expect traffic controlled by signal lights and a pilot car in use).

Facilities:

Rest areas along this highway segment are: open eastbound at Junction Montana 83 North (services available include handicapped accessible).

Weather:

The forecast until 7:00 AM MDT on Monday, April 24: Skies will be mostly cloudy becoming partly clear. Visibility will be five miles in haze changing to two miles. There will be scattered very light snow changing to widely scattered very light snow. Winds will be 6 mph from the west-northwest. Temperatures will range from 35 to 43 F changing to 28 to 36 F.