Location:

MT-200 between Jordan and Circle

Road Conditions:

Road conditions as of 9:45 PM MDT on Monday, July 15 are as follows: dry. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction projects are in effect: milling between Junction Montana 59 South-Jordan and Junction Montana Secondary 245 West-Jordan including delays up to 15 minutes, flaggers present, and reduced speed limited to 35 MPH (travelers can expect loose gravel, grooved road surface, a pilot car in use, single lane traffic, and traffic controlled by signal lights) and sign installation between 9 miles west of Junction Montana Secondary 462 South and 0.50 mile east of Junction Montana Secondary 253-Brockway including flaggers present and reduced speed limited to 35 MPH.

Facilities:

Rest areas along this highway segment are: open eastbound at Junction Montana 24 North (services available include handicapped accessible).

Weather:

The forecast until 4:00 AM MDT on Tuesday, July 16: Skies will be partly clear becoming mostly cloudy. Visibility will be ten miles. There will be scattered thunderstorms changing to scattered very light rain. Winds will be 3 mph from the southeast changing to 5 mph from the south. Temperatures will range from 61 to 71 F changing to 60 to 64 F.