Location:

US-191 between Junction Montana 19 and Malta

Road Conditions:

Road conditions as of 7:30 AM MDT on Wednesday, September 23 are as follows: dry. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction projects are in effect: shoulder work between 17.75 miles north of Junction Montana 19 South and 17.75 miles south of Junction Montana 66 North including reduced speed (travelers can expect gravel surface and loose gravel), miscellaneous maintenance at 14.25 miles south of Junction Montana 66 North including reduced speed, miscellaneous maintenance at 4.25 miles south of Junction Montana 66 North including delays up to 15 minutes, a detour, and reduced speed (travelers can expect single lane closures, loose gravel, traffic controlled by signal lights, and single lane traffic), and miscellaneous maintenance at 13.25 miles north of Junction Montana 66 North including delays up to 15 minutes, a detour, flaggers present, and reduced speed (travelers can expect loose gravel, rough road surface, single lane closures, and gravel surface). Motorcycles should consider alternate route.

Restrictions:

The following restrictions are in effect: width restriction limited to 16 feet at 14.25 miles south of Junction Montana 66 North, height restriction limited to 15 feet and width restriction limited to 16 feet at 4.25 miles south of Junction Montana 66 North, and width restriction limited to 16 feet at 13.25 miles north of Junction Montana 66 North.

Weather:

The forecast until 1:00 PM MDT on Wednesday, September 23: Skies will be partly clear. Visibility will be five miles in haze changing to ten miles. No precipitation is expected. Winds will be 5 mph from the west-northwest. Temperatures will range from 42 to 52 F changing to 66 to 72 F.