Location:

US-2 between East Glacier Park and Junction Interstate 15 at Shelby

Road Conditions:

Road conditions as of 1:15 AM MDT on Monday, April 24 are as follows: dry with the following exception - wet between Junction Montana 49 North-East Glacier Park and Junction Montana Secondary 444 North. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction projects are in effect: rumble strip maintenance including delays up to 15 minutes and reduced speed limited to 35 MPH (travelers can expect traffic controlled by signal lights and a pilot car in use) and signal installation between 0.75 mile west of Junction US 89 North-Browning and Junction Montana Secondary 464-Browning including intersection work (travelers can expect single lane closures).

Weather:

The forecast until 7:00 AM MDT on Monday, April 24: Skies will be mostly cloudy becoming partly cloudy. Visibility will be five miles in haze changing to ten miles. There will be scattered very light snow changing to occasional very light snow. Winds will be 8 mph gusting to 17 mph from the northwest changing to 11 mph gusting to 22 mph from the west. Temperatures will range from 28 to 40 F.