Location:

US-2 between East Glacier Park and Junction Interstate 15 at Shelby

Road Conditions:

Road conditions as of 2:00 AM MDT on Saturday, May 27 are as follows: dry. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction projects are in effect: rumble strip maintenance between Junction Montana 49 North-East Glacier Park and 0.25 mile west of Junction Montana Secondary 213 North-Cut Bank including delays up to 15 minutes and reduced speed limited to 35 MPH (travelers can expect traffic controlled by signal lights and a pilot car in use), including reduced speed, signal installation between 0.75 mile west of Junction US 89 North-Browning and Junction Montana Secondary 464-Browning including delays up to 5 minutes and intersection work (travelers can expect single lane closures), and striping between 0.25 mile west of Junction Montana Secondary 213 North-Cut Bank and Junction Interstate 15-Shelby including reduced speed limited to 55 MPH.

Weather:

The forecast until 8:00 AM MDT on Saturday, May 27: Skies will be partly clear becoming mostly clear. Visibility will be ten miles. Widely scattered very light rain will be ending. Winds will be 8 mph from the west changing to 13 mph from the west. Temperatures will range from 37 to 47 F changing to 42 to 56 F.