Location:

US-2 between Junction Interstate 15 at Shelby and Havre

Road Conditions:

Road conditions as of 4:00 PM MDT on Tuesday, May 21 are as follows: dry. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction project is in effect: reconstruction between 3.75 miles west and 4.50 miles east of Junction Montana Secondary 343-Galata including delays up to 15 minutes and reduced speed (travelers can expect gravel surface, loose gravel, traffic controlled by signal lights, a pilot car in use, and single lane traffic). Motorcycles should consider alternate route.

Weather:

The forecast until 10:00 PM MDT on Tuesday, May 21: Skies will be overcast. Visibility will be ten miles changing to five miles. There will be frequent light rain changing to continuous light rain. Winds will be 15 mph gusting to 26 mph from the east changing to 7 mph from the east. Temperatures will range from 44 to 48 F changing to 41 to 45 F.