Location:

US-2 between Havre and Malta

Road Conditions:

Road conditions as of 5:30 AM MDT on Monday, September 21 are as follows: dry. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction projects are in effect: reconstruction between 10.50 miles east of Junction Montana Secondary 232-Havre and 1 mile west of Junction Montana Secondary 325 North-Chinook including delays up to 15 minutes, flaggers present, and reduced speed limited to 35 MPH (travelers can expect loose gravel, rough road surface, grooved road surface, a pilot car in use, gravel surface, and traffic controlled by signal lights) and miscellaneous maintenance between 5.50 miles east of Junction Montana Secondary 325 North-Chinook and 8.75 miles west of Junction Montana Secondary 241 North-Harlem including delays up to 5 minutes and flaggers present (travelers can expect single lane closures).

Weather:

The forecast until 11:00 AM MDT on Monday, September 21: Skies will be clear becoming mostly clear. Visibility will be five miles in haze changing to ten miles. No precipitation is expected. Winds will be 6 mph from the west. Temperatures will range from 45 to 51 F changing to 53 to 59 F.