Location:

US-2 between Glasgow and North Dakota State Line

Road Conditions:

Road conditions as of 7:00 PM MDT on Thursday, September 19 are as follows: dry. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction projects are in effect: pulverizing between Poplar and 1.75 miles east of Poplar including intersection work, a detour, flaggers present, and reduced speed limited to 35 MPH (travelers can expect loose gravel, rough road surface, and single lane traffic) and miscellaneous maintenance between 1 mile east of Junction Montana 16 North-Culbertson and 3 miles west of Junction Montana Secondary 405 North-Bainville including delays up to 10 minutes, a detour, flaggers present, and reduced speed limited to 35 MPH (travelers can expect loose gravel, a pilot car in use, gravel surface, and traffic controlled by signal lights). Motorcycles should consider alternate route.

Restrictions:

The following restrictions are in effect: width restriction limited to 12 feet between Poplar and 1.75 miles east of Poplar and width restriction limited to 16 feet between 1 mile east of Junction Montana 16 North-Culbertson and 3 miles west of Junction Montana Secondary 405 North-Bainville.

Weather:

The forecast until 1:00 AM MDT on Friday, September 20: Skies will be mostly clear becoming partly clear. Visibility will be ten miles changing to five miles in haze. There will be widely scattered thunderstorms changing to scattered thunderstorms. Winds will be calm. Temperatures will range from 66 to 76 F changing to 58 to 64 F.