Location:

US-212 between Junction Interstate 90 near Crow Agency and Broadus

Road Conditions:

Road conditions as of 1:15 AM MDT on Monday, April 24 are as follows: dry. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction projects are in effect: miscellaneous maintenance between 1.50 miles west of Junction Montana Secondary 314 South-West of Busby and 3.50 miles west of Junction Montana 39 North-Lame Deer including reduced speed limited to 55 MPH, miscellaneous maintenance between 3.25 miles west of Junction Montana 39 North-Lame Deer and Junction Montana Secondary 566-Ashland, and reconstruction between 3.25 miles east and 10.75 miles east of Junction Montana Secondary 484 including reduced speed (travelers can expect traffic controlled by signal lights).

Weather:

The forecast until 7:00 AM MDT on Monday, April 24: Skies will be mostly cloudy. Visibility will be ten miles changing to five miles in haze. There will be scattered very light rain. Winds will be 14 mph gusting to 26 mph from the north changing to 7 mph gusting to 20 mph from the west-northwest. Temperatures will range from 42 to 48 F changing to 37 to 43 F.