Location:

US-89 between Pendroy Junction and Junction US 2 at Browning

Road Conditions:

Road conditions as of 7:00 PM MDT on Saturday, April 29 are as follows: dry with the following exception - wet and falling snow between 8 miles south of Junction US 2 East and Junction US 2 West-Browning. Actual road conditions may vary from this report. Motorists are cautioned to be alert to changing conditions.

Construction:

The following construction projects are in effect: rumble strip maintenance including delays of uncertain duration and reduced speed (travelers can expect traffic controlled by signal lights and a pilot car in use), rumble strip maintenance including delays up to 15 minutes and reduced speed limited to 35 MPH (travelers can expect traffic controlled by signal lights and a pilot car in use), and signal installation between 0.50 mile south of Junction US 2 West-Browning and Junction US 2 West-Browning including delays up to 5 minutes and intersection work (travelers can expect single lane closures).

Facilities:

Rest areas along this highway segment are: closed northbound at 0.75 mile north of Junction Montana Secondary 534-Dupuyer.

Weather:

The forecast until 1:00 AM MDT on Sunday, April 30: Skies will be partly cloudy becoming mostly cloudy. Visibility will be ten miles. Widely scattered very light rain will be ending. Winds will be 13 mph gusting to 18 mph from the west-southwest changing to 7 mph from the south. Temperatures will range from 44 to 52 F changing to 37 to 39 F.