NEVADA DEPARTMENT OF TRANSPORTATION
ROAD CONSTRUCTION SUMMARY
NOVEMBER 20, 2009
2:37 PM PST
IR15:
Between Junction Interstate 515 US 93 and US 95 Exit 42 and Junction
State Route 573-Craig Road-Las Vegas Exit 48. (5.5 miles)
In progress.
Scheduled to be completed 2:15PM PDT on Wed, Jun 30, 2010.
- miscellaneous construction
- speed limit 55 mph
Between 0.4 miles north of Junction State Route 578-Washington
Avenue-Las Vegas Exit 44 and Junction State Route 147-Lake Mead
Boulevard-Las Vegas Exit 45. (0.7 miles)
In progress.
Scheduled to be completed 9:00AM PST on Thu, Dec 31, 2009.
- miscellaneous construction on ramps
- detour 3 miles
- northbound off-ramp closed
Between 1.1 miles south of Junction State Route 169-Logandale and
Overton Exit 93 and 1 mile north of East Mesa Exit 109. (17 miles)
In progress.
Scheduled to be completed 5:00AM PST on Mon, Nov 30, 2009.
- miscellaneous construction
- miscellaneous construction at intersections
- pavement repair in the passing lane
- grading on the shoulder
- lanes reduced to 1
Work recurring Mon-Fri.
Between Junction State Route 160-Blue Diamond Road-Las Vegas Exit 33
and Junction State Route 589-Sahara Avenue-Las Vegas Exit 40. (7
miles)
In progress.
Scheduled to be completed 11:00PM PST on Mon, Nov 30, 2009.
- miscellaneous construction in the median
- miscellaneous construction in the passing lane
- lanes reduced to 4
Between Junction State Route 578-Washington Avenue-Las Vegas Exit 44
and 0.4 miles north of Junction State Route 578-Washington
Avenue-Las Vegas Exit 44. (0.4 miles)
In progress.
Scheduled to be completed 5:00AM PST on Thu, Dec 24, 2009.
- miscellaneous construction on ramps
- detour 2 miles
- southbound off-ramp closed
Between Junction State Route 578-Washington Avenue-Las Vegas Exit 44
and 0.4 miles north of Junction State Route 578-Washington
Avenue-Las Vegas Exit 44. (0.4 miles)
In progress.
Scheduled to be completed 5:00AM PST on Thu, Dec 24, 2009.
- miscellaneous construction on ramps
- detour 2 miles
- northbound on-ramp closed
- northbound off-ramp closed
Between 0.9 miles south of Junction Interstate 515 US 93 and US 95
Exit 42 and Junction Interstate 515 US 93 and US 95 Exit 42. (0.9
miles)
Scheduled to start 9:00PM PST on Sun, Nov 22, 2009.
Scheduled to be completed 5:00AM PST on Mon, Nov 23, 2009.
- paving on ramps
- miscellaneous construction on ramps
- detour 2 miles
- southbound off-ramp closed
- southbound on-ramp closed
Work recurring Sun-Mon.
IR80:
Between East Verdi Exit 5 and 0.3 miles east of Junction West 4th
Street-Reno Exit 7. (2.3 miles)
Scheduled to start 6:30AM PST on Mon, Nov 23, 2009.
Scheduled to be completed 5:00PM PST on Tue, Nov 24, 2009.
- bridge repair on bridges
- detour 1 miles
- eastbound on-ramp closed
- truck speed limit 55 mph
- truck detour 1 miles
- width limit 12 feet
- travel delay 5 minutes
- no passing
- lanes reduced to 1
Work recurring Tue.
IR515:
Between 1.4 miles north of Junction State Route 562-Sunset Road Exit
63 and Junction State Route 593-Tropicana Avenue-Las Vegas Exit 67.
(2.3 miles)
In progress.
Scheduled to be completed 5:00AM PST on Mon, Dec 28, 2009.
- miscellaneous construction in the driving lane
- miscellaneous construction on the shoulder
- lanes reduced to 3
Work recurring Sun-Thu between 9PM and 5AM.
US93:
Between 13.5 miles south of Contact and 6.5 miles north of Contact.
(20 miles)
Scheduled to start 12:00AM PST on Mon, Nov 23, 2009.
Scheduled to be completed 12:00AM PST on Mon, Nov 30, 2009.
- miscellaneous construction
- pilot car
- width limit 14 feet
- travel delay 20 minutes
- speed limit 55 mph
Work recurring Mon-Fri between 6AM and 6PM.
Between 8.7 miles north of Junction State Route 223 and 9.5 miles
south of H D Summit. (1 mile)
In progress.
Scheduled to be completed 12:00AM PST on Mon, Nov 30, 2009.
- miscellaneous construction
- flaggers
- width limit 14 feet
- travel delay 20 minutes
- speed limit 55 mph
- lanes reduced to 1
Work recurring Mon-Fri between 6AM and 6PM.
US95:
Between 6 miles south of Mercury and 4 miles south of Mercury. (2
miles)
In progress.
Scheduled to be completed 9:00PM PST on Fri, Dec 4, 2009.
- grading
- paving
- miscellaneous construction
- flaggers
- pilot car
- traffic routed to opposing lanes
- travel delay 15 minutes
- no passing
- lanes reduced to 1
Work recurring Mon-Fri between 6AM and 9PM.
Between 0.3 miles north of Junction Interstate 15-Downtown
Expressway Exit 76 and Junction State Route 147-Lake Mead Boulevard
Exit 82. (6.1 miles)
In progress.
Scheduled to be completed 12:00AM PDT on Mon, Aug 30, 2010.
- miscellaneous construction on the shoulder
Work recurring Mon-Fri between 12AM and 11PM.
Between 0.5 miles north of Jungo Road and 5.6 miles north of
Junction State Route 795-Reinhart Lane. (7 miles)
In progress.
Scheduled to be completed 12:00AM PST on Fri, Nov 27, 2009.
- miscellaneous construction
- flaggers
- width limit 14 feet
- speed limit 25 mph
US395:
Between 0.1 miles south of Winters Ranch and Chocolate Factory. (1.8
miles)
In progress.
Scheduled to be completed 2:00PM PST on Fri, Dec 18, 2009.
- miscellaneous construction on the shoulder
Work recurring daily between 2PM and 2PM.
Between 2 miles north of Washoe Hill-South of Reno and 3 miles north
of Washoe Hill-South of Reno. (1 mile)
In progress.
Scheduled to be completed 3:30PM PST on Fri, Nov 20, 2009.
- bridge repair on the shoulder
- miscellaneous construction on the shoulder
- flaggers
- width limit 14 feet
- travel delay 20 minutes
- no passing
- lanes reduced to 2
Work recurring Mon-Fri between 7AM and 3:30PM.
Between 2 miles north of Washoe Hill-South of Reno and 3 miles north
of Washoe Hill-South of Reno. (1 mile)
In progress.
Scheduled to be completed 3:30PM PST on Fri, Nov 20, 2009.
- miscellaneous construction in the driving lane
- flaggers
- width limit 14 feet
- travel delay 20 minutes
- speed limit 50 mph
- no passing
- lanes reduced to 1
Work recurring Mon-Fri between 7AM and 3:15PM.
SR147:
Between Junction Losee Road and Junction State Route 604-Las Vegas
Boulevard. (0.8 miles)
In progress.
Scheduled to be completed 11:00PM PST on Mon, Nov 30, 2009.
- bridge construction on bridges
- miscellaneous construction
- lanes reduced to 1
Between Junction Losee Road and Junction State Route 604-Las Vegas
Boulevard. (0.8 miles)
In progress.
Scheduled to be completed 5:00AM PST on Mon, Feb 1, 2010.
- bridge construction
- detour 4 miles
- height limit 14 feet
Between Junction Losee Road and Junction Interstate 15. (0.2 miles)
In progress.
Scheduled to be completed 5:00AM PST on Mon, Jan 4, 2010.
- bridge construction
- bridge construction adjacent to the roadway
- bridge construction on the shoulder
- detour 3 miles
- height limit 14 feet
Between Junction Losee Road and Junction Interstate 15. (0.2 miles)
In progress.
Scheduled to be completed 11:00PM PST on Thu, Dec 24, 2009.
- pavement repair
- bridge construction
- road closed
SR278:
Between 7.8 miles south of Junction Interstate 80 at West Carlin and
6.8 miles south of Junction Interstate 80 at West Carlin. (1 mile)
In progress.
Scheduled to be completed 4:30PM PST on Fri, Nov 20, 2009.
- maintenance on the shoulder
- flaggers
Work recurring Wed-Sat.
SR289:
Between Junction Melarkey Street and US 95 and 0.1 miles north of
Junction Interstate 80. (0.8 miles)
In progress.
Scheduled to be completed 12:00AM PST on Fri, Nov 27, 2009.
- miscellaneous construction
- flaggers
- width limit 14 feet
- speed limit 25 mph
SR487:
Between Utah State Line and 2 miles north of Utah State Line. (2
miles)
In progress.
Scheduled to be completed 3:00PM PST on Fri, Nov 20, 2009.
- maintenance
- flaggers
SR574:
Between Junction Interstate 15 and Junction State Route 612-Nellis
Boulevard. (3.5 miles)
In progress.
Scheduled to be completed 5:00AM PDT on Mon, Jun 28, 2010.
- grading
- paving
- striping
- utilities work at intersections
SR578:
Between Junction Interstate 15 and 0.1 miles east of Junction
Interstate 15. (0.1 miles)
In progress.
Scheduled to be completed 5:00AM PST on Wed, Nov 25, 2009.
- miscellaneous construction on ramps
- detour 2 miles
- westbound on-ramp closed
SR579:
Between Martin Luther King Boulevard and 0.4 miles west of Junction
State Route 601-Main Street. (0.6 miles)
In progress.
Scheduled to be completed 12:00AM PST on Mon, Nov 30, 2009.
- fresh oil and gravel
- paving
- no passing
- lanes reduced to 1
END
View the legal restrictions and terms of use applicable to this site. Use of this site signifies your agreement to the terms of use. Technical problems or site related comments should be directed to the webmaster.
Copyright © 2001-2009
Meridian Environmental Technology Inc.
Unless otherwise noted, graphics and/or maps used in this web site are copyrighted by
Meridian Environmental Technology Inc. and may not be copied or modified, in whole or
in part, for distribution to or for use by others.